Projects

Our goal then and now is to provide quality on-time projects.

QATAR Projects

2007-2010

01.

230 Villa compound & shopping center at Algharafa-Doha: complete construction as turkey project starting data: 2007 completing date: 2009

02.

Alghanem Building- Doha: complete renovation of civil work and MEP work

03.

Ministry of interior MOI/ police medical center-Doha: Dental center: complete building renovation

2011

01.

Military Hospital ABM- laboratory dep, -Doha civil work for complete fit out.

02.

Military Hospital ABM- Radiology dep,/ Ct-scan Room, X-ray Room & Ultrasound Room – Doha: civil work and MEP work for complete fit out.

03.

Military Hospital ABM- Dental dep,- Doha: civil work for complete fit out.

04.

Falcon clinic – Doha: civil work for surgery dep,- Installation of HT –modular room system.

05.

Hamad Medical Corporation HMC/Radiology dep,- X-ray and CT-Scan Room –Doha: complete fit out for civil work and MEP work.

06.

Hamad Medical Corporation HMC /Radiology dep,- MRI Room- Doha: fit out work.

07.

Hamad General Hospital HGH/Heart center – Doha: 4Cathlab, Room area & 1 Hybrid Room area: complete civil work and MEP work starting date: 2011/completion date:2012.

08.

Aspitar Hospital- Radiology dep,- Ct-Scan Room- Doha: civil work for the complete fit out.

2012

01.

Military Hospital ABM- Dental dep,- Doha: civil work for complete fit out.

02.

Hamad General Hospital HGH- Radiology dep,/ Ct-Scan Room-Doha: civil work and MEP work for complete fit out.

03.

Doha clinic/ Radiology dep,- Doha: Design & planning work for a new imaging dep.

04.

Aljazira clinic- Doha: Design& planning work for a new medical dep.

2013

01.

Military Hospital ABM- Emergency dep,-Doha: civil work & MEP work for complete fit out.

02.

Ministry of interior MOI/ Police medical center/ Emergency dep,- Doha: : civil work & MEP work for complete fit out.

03.

Hamad General Hospital HGH- PET_CT center for Diagnosis & Research- Doha civil work for walling according to health and safety plan.

04.

Qatar foundation- Medical center- Radiology dep,- Doha: X-Ray-, Ultrasound & panorama Room: complete fit out for civil work and MEP work.

2014-2015

01.

Military Hospital ABM- Surgery dep/ 1 operation theater area- shehanyia: complete fit out for civil work with HT-Modular room system.

02.

Ministry of interior MOI/ Police training institute- Medical center- Doha: Radioligy dep,/ X-Ray- & Panorama Room: complete fit out for civil work and MEP work Medical center: civil work- wall decorative design paint.

03.

Anti-Doping lab Qatar ADLQ- Doha: complete fit out for the 3rd floor for civil work including HT-Modular room system & HPL wall system. Starting date:2014/ completion date:2015.

04.

Military Hospital ABM- Surgery dep/ 1 operation theater area- shehanyia: complete fit out for civil work with HT-Modular room system.

2016

01.

Al-AHLI Hospital- Radiology dep,/ X-Ray Room & Fluoroscopy Room-Al-Wakrah: complete fit out for civil work.

02.

Sidra Hospital- Radiology dep,/ X-Ray Room- Doha: complete fit out for civil work.

03.

Alshomoukh Tower –Qatar Gas dental center- Doha: civil work for fit out.

04.

Qatar mall –Carrefour-Doha: civil work for fit out.

05.

Syrian American Medical center- Surgery dep ,- Doha: civil work for fit out.

06.

Hamad Medical Corporation HMC/ Radiology dep,- Doha: IR Angiography Room: Design & planning work.

2017

01.

Al-Ahli Hospital – laboratory dep-Doha: Turkey project for civil & MEP Works for a complete new fit out.

02.

Al-Ahli Hospital –Cathlab, area –Doha: civil work –Ceiling steel structure for a new fit out.

03.

HMC Hospital-laboratory dep-Doha: Turkey project for civil & MEP works for a complete new fit out.

04.

HMC Hospital- Sterilization dep- Doha: Turkey project for civil & MEP works.

2018

01.

HMC-HBKMC-WWRC/ACC Maintenance the 21 OR,s Area Up 2015 till today.

02.

HGH Conference Room (Room 9): fit out for civil and MEP works.

2019

01.

AlEmadi Hospital- MRI Suite: fit out for civil and MEP works.

02.

ALEmadi Hospital- X-Ray Room: fit out for civil and MEP works.

2020

01.

HMC-UM Salal Isolation complex-X-RAY Room: fit out for civil and MEP works.

02.

Alkhor Hospital-X-Ray Room : fit out for civil and MEP works.

03.

Turkish armed force Hospital-X-Ray Room: fit out for civil and MEP works.

04.

Turkish armed force Hospital- Dental Room: fit out for civil and MEP works.

05.

Mesiaeed Hospital –X-Ray Room : fit out for civil and MEP works.

06.

HMC-WWRC- Modification-to- procedure-suite- to- from- URODYNAMIC-suite.

07.

MOI Police clinic –MRI suite/Quench piping.

2021

01.

Alkhor Hospital – MRI suite: fit out for civil and MEP works 2020-2021.

02.

AMAN Hospital- MRI suite: fit out for civil and MEP works 2021.

03.

Alkhor Hospital — VIP Patient Room: Turnkey for civil and MEP Works

04.

Heart Hospital CT Scan Room:fit out for civil and MEP Works

05.

Heart Hospital UPS UNITS: Supply and Install Of civil and MEP Works

2022-2023

01.

HMC: HMC – WWRC – Room W9-2009 into BLS2 Transitional Research Lab. (NI-21-0010)

02.

HMC – NCCCR Hospital:Medical linear accelerator machine (LINAC)

03.

HMC:Renovation works required in Al-Khor Hospital – porta cabin room number 17 & 25

04.

AL-KHOR Hospital:Steam System (BOILER ROOM)

05.

Sidra Hospital: Sidra Medicine – OR Area — Doors Project

2023

Ongoing Projects

01.

Sidra Hospital: Sidra Medicine – OR Area — Doors Project

02.

HMC: NCCCR- Inpatient Pharmacy – Design-Build Construction and Complete Modification.

03.

HMC: NCCCR- Patient Garden Room – Design-Build of Construction and Installation of Retractable Pergola at the NCCCR Central.

KSA Projects

2012-2013

01.

King Abdullah Hospital /surgery dep,- Mecca: Civil work for complete installation of HT- Modular room system. Starting date: 2012/ completion date: 2013.

02.

King Abdul Aziz Hospital/ surgery dep, – Riyadh: civil work for complete installation of HT-Modular room system.

03.

King Faisal Hospital/ surgery dep, – Taif: civil work for complete installation of HT-Modular room system.

Project Descriptions

Sidra Medicine - OR Areas-Doors Project

HMC - WWRC - Room W9-2009 into BLS2 Transitional Research Lab. (NI-21-0010)

Heart Hospital UPS Room for CathLab Area

Heart Hospital - CT Scan Room Project

Al-Khor Hospital - MRI suite Project

AIWakrah Hospital - MRI Suite Project

AMAN Hospital - MRI Suite Project

Al Khor Hospital – MRI SUITE

Al Khor Hospital – X-Ray Room & VIP Patient Room

HGH Conference Room ( Room 9 )

Al Emadi Hospital – MRI SUITE

HMC – QRI – Lab

Hamad Bin Khalifa city (HMC) laboratory dept. Doha

Civil Work: Glass modular wall system, stainless modular steel wall system, GI galvanized ceiling system. Gypsum board ceiling system with anti-bacterial paint, Wall & Ceiling steel supporting system “Atlas”, Window glazing, Glass doors, Stainless steel doors, Wall medical devices, Ventilation system / laminar air flow, Illumination system, LED wall system, Expansion joint solution flooring self-leveling, Vinyl flooring.

MEP work: Electrical work connection to the BMS

Hamad Bin Khalifa Medical City

Women’s & Ambulatory Hospital – Doha: 21 Operation Theaters including Medical area of 4200m2 on 2nd and 3rd floors

ADLQ – Laboratory on 3rd Floor – Doha

Civil Work: Stainless steel wall system, GI galvanized ceiling system, Gypsum board ceiling system with anti-bacterial paint, Flooring self-leveling, Vinyl flooring, Window glazing, Stainless steel doors, Polyrey wooden doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system.

HIGH – Heart Hospital / 4 Cathlab. Rooms area & 1 Hybrid Room area – Doha

Civil Work: Installation of HT-Modular room system with all related medical devices: HPL – Impact wall system, GI galvanized wall system, wall lead lining, GI galvanized ceiling system, Window glazing, Stainless steel doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system Wall sound isolation system.

Including: Demolishing work for the existing flooring self-leveling, Vinyl flooring,–Ceiling steel structure for heavy medical equipment, and carpentering work.

MEP work:Plumbing work, piping work, ducting work, Electrical work

Police Medical Center/MOI- Dental Center- Doha

Civil Work: Stainless steel wall system, GI galvanized ceiling system, HPL – Impact wall system, GI galvanized wall system, wall lead lining, Window glazing, Stainless steel doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system.

MEP work: Plumbing work, piping work, ducting Work, Electrical work

Villa compound & shopping center at Algharafa- Doha

King Abdullah Hospital / Surgery dep. – Mezza

Civil Work: Stainless steel wall system, GI galvanized ceiling system, HPL – Impact wall system, GI galvanized wall system, wall lead lining, Window glazing, Stainless steel doors, Wall medical devices, Ventilation system / Laminar air flow, Illumination system.